Namnang Walkways, Const., March 2013

IMG_6174

FInally the walkway gets above the road level and we can see how the construction is shaping up. The posts for the roof cover are installed and maximum care is taken so that the alignment of the walkway matches that of the road.

IMG_6170

A point of worry is the distance that exists between the location and layout of the walkway and the road and the gap between them is some cause for concern. There will have to be a  design intervention that will address this issue.

IMG_6161 IMG_5476 IMG_5371

A view of the restaurant area as it is constructed. This should be seen in relation with the rendering and it would appear that it if following the design.

IMG_5357The road beside the restaurant.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s